by Yayasan Sungai Watch IndonesiA2 · single evaluatorMedium confidencePreventive
Release conditions for escrowed funds
This work was assessed by a single evaluator. That matches the A2 assurance tier this listing carries. Every release still requires Council approval as a second layer of scrutiny.
No evaluator has locked a release schedule for this listing yet.
No supporting documents could be read for this claim. They may not have been attached, or the storage gateway may be slow to answer — reload in a moment before drawing a conclusion.
Declared investment Rp 2.400.000.000. The cost envelope is this figure plus a 20% margin; the evaluator's floor is allocated out of that envelope.
Rincian biaya dari laporan keuangan yayasan 2024, diaudit internal. Bukti fisik: foto instalasi barrier bertanggal, kontrak sewa gudang, dan catatan penggajian tim pemilah.
Line items total Rp 2.400.000.000 against a declared Rp 2.400.000.000 — they reconcile.
Line items only — no documents attached. The figures are asserted, not evidenced.